Molescroft

Main Contractor

Kitchen Civils were awarded the Main Contractor contract on Molescroft Roundabout Works in July 2015. The works were part of infrastructure
improvement in the East Riding to facilitate further housing expansion in Beverley. The works entailed connecting Driffield Road to Malton Road, installing two new roundabouts on existing infrastructure whilst keeping access open for East Riding residents and the ambulance station due to its proximity on Driffield Road.

Scope of Works

  • Bulk earthworks and removal of existing carriageway
  • Construction of two new roundabouts on existing road infrastructure whilst keeping road network open.
  • Construction of 500m of new carriageway
  • Drainage and Attenuation
  • Surfacing & White Lining
  • De-watering
  • Planing, Surfacing and Tie In’s to existing infrastructure
  • Lighting and Signage
  • Traffic Management and Diversions
  • Stakeholder engagement with Local Authority, Internal Drainage Boards and Emergency Services
  • Location:
    Beverley East Yorkshire
  • Contract Type:
    Bespoke
  • Contract Length:
    14 months
  • Value:
    £3.2m